{"id":6562,"date":"2026-04-23T22:51:11","date_gmt":"2026-04-24T05:51:11","guid":{"rendered":"https:\/\/hollowaybar.com\/gold\/?p=6562"},"modified":"2026-04-23T22:51:11","modified_gmt":"2026-04-24T05:51:11","slug":"the-work-list-was-long","status":"publish","type":"post","link":"https:\/\/hollowaybar.com\/gold\/the-work-list-was-long\/","title":{"rendered":"The Work List Was Long"},"content":{"rendered":"<p>This is 40 year old carpet on its way out and rubber flooring going down. We worked on the shop roof repair and inside wood and paint, wow looks great. Nice and bright. New front stairs a three day job ! By the time the work was completed the fire wood was coming in and I was piling it up and covering it up. WOW AND DID WE BURN IT UP ! -50c for three weeks<\/p>\n<p><a href=\"https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6563\" src=\"https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-scaled.jpg 2560w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-300x225.jpg 300w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-1024x768.jpg 1024w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-150x113.jpg 150w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-768x576.jpg 768w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-1536x1152.jpg 1536w, https:\/\/hollowaybar.com\/gold\/wp-content\/uploads\/2026\/04\/IMG_6610-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This is 40 year old carpet on its way out and rubber flooring going down. We worked on the shop roof repair and inside wood and paint, wow looks great. Nice and bright. New front stairs a three day job ! By the time the work was completed the fire wood was coming in and &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/hollowaybar.com\/gold\/the-work-list-was-long\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;The Work List Was Long&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-6562","post","type-post","status-publish","format-standard","hentry","category-watsonlake"],"_links":{"self":[{"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/posts\/6562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/comments?post=6562"}],"version-history":[{"count":1,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/posts\/6562\/revisions"}],"predecessor-version":[{"id":6564,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/posts\/6562\/revisions\/6564"}],"wp:attachment":[{"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/media?parent=6562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/categories?post=6562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hollowaybar.com\/gold\/wp-json\/wp\/v2\/tags?post=6562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}